A successful installation depends on supplied materials, site readiness and coordination between everyone involved. Our process gives each project a clear starting point, an agreed installation scope and a practical way to address questions as work progresses. The details are confirmed for the individual assignment.
We begin with shop drawings, elevations, installation details and project information. We review what is being installed, where it is located, the finishing requirements and which components are included.
Before scheduling, we clarify installation responsibilities and details that affect the work. Commercial projects are undertaken on an hourly basis. Residential pricing is reviewed against the agreed scope and available project information.
The project team arranges delivery and staging of the supplied components. Together, we confirm access, parking, elevator arrangements, permitted working hours and the condition of installation areas.
Walls, floors and related work need to be ready for the planned installation. Missing components, restricted access or unresolved dimensions should be identified early so their effect on the schedule can be discussed.
We work from the supplied drawings and agreed details, fitting and aligning cabinetry, panels, fillers, trim and hardware within the confirmed scope.
If we encounter damaged or missing parts, conflicting dimensions or conditions that differ from the drawings, we raise the issue with the designated contact. Decisions affecting the finished result, materials or installation time are agreed before proceeding with the change.
Changes can affect labour, sequencing and the need for another visit. Additional tasks and revised details are reviewed with the project contact so the work and its pricing basis are understood.
This also applies when installation depends on replacement components or another trade completing its work. Return visits are coordinated around these requirements and availability.
At completion of the agreed work, we check alignment, accessible hardware and door and drawer operation. Final adjustments are made within the installation scope.
We review remaining items with the project contact, identify outstanding components or dependencies and confirm next steps. The work area is left orderly, with waste handling arrangements established as part of the project scope.